Skip to content

Customizing Mechanical & Electrical Infrastructure & Service

Specializing in Conception through Completion Customized Experience

Stark Equipment strives to be a trusted infrastructure partner supporting Commercial, Industrial & Mission Critical HVAC, Power & Boiler system applications. We specialize in data center & cleanroom projects creating a truly unique integration capability. Our technical experts are committed to providing excellent service and customized solutions designed to keep critical assets online.

“The team engineered a creative, cost-effective solution to fit our unique space. Their solution was unparalleled to any other proposal.”

– Commercial Office Building owner, Rochester, NY

Applied HVAC

Engineered solutions for controlling the temperature, humidity, and air quality of the indoor environment in any commercial or industrial building. Markets served: K-12 Education, High Education, Gaming & Entertainment, Government, Healthcare, Hospitality, Industrial & Manufacturing, Mixed Use & Residential, Office Buildings, Restaurants, & Retail.

"We developed a strategic plan to replace my UPS without downtime to data center operations, which was implemented to great success."

– State Agency, Albany, NY

Critical Power

End to End Facility Power Systems including Power Generation, Power Distribution, Transfer Switching, UPS Systems and Generator Services. Serving industries such as healthcare, data centers, industrial & commercial space.

“The cleanroom design presented checked off every requirement we needed within budget and schedule.

– Cancer facility in Central New York

Critical HVAC / Cleanroom

Mission-critical full engineering solutions, including design, turnkey implementation, commissioning and service agreements to meet specific technical critical project specifications. Serving industries such as cleanrooms, research laboratories, industrial process, warehouses, and process isolation rooms. 

The skidded system installation was seamless and executed on time and in budget. The team was profession, quick and thorough."

– National Hotel Chain

Boiler & Combustion

From design to implementation to commissioning, our team provides solutions for new and existing infrastructure. The engineering team provides solutions for system design, skidded systems, replacements and retrofits. Through valued partnerships and engineering expertise, the boiler group offers solutions that optimize control, reduce energy spend and provide long-term technology roadmaps that justify capital investments.

puckpitt-logo

Our Story

Stark is a leader in comprehensive intelligent building solutions that brings together a diverse and specialized group of technologies, services and expertise. We understand our clients and their unique needs. Our highly calibrated team works to ensure successful execution of technology installation, commissioning and service. Our team’s “can do” attitude is the result of a company culture that promotes personal and professional grow through continuous training and development.

Customized Integrated Solutions

When everything works together, everything works better.

Case Study
catholic-health

Air handling unit construction materials and major components were constructed of all aluminum or stainless-steel materials. This all-aluminum construction included the 2-1/2” panels system, the structural support base, and the AHU walking surfaces. Internal components consisted of three levels of filtration (HEPAs, carbon, and pre-filtration, heat recovery, hot-water heating, chilled water cooling, steam humidification, and an 8-fan array.

A temporary rental system was supplied to risk-mitigate downtime concerns during mechanical room demolition and the field building of each new AHU. Each unit was field erected in place in less than three weeks.

Both units were field performance tested to assure quantified performances were met. Units were air-leakage tested at 8” static pressure allowing less than 1/2% air leakage.

One of the units was designed around an existing building column, carefully located within the AHU design to allow proper airflow and unit serviceability.

Case Study
clarkson

Stark Tech Group’s equipment business unit designed a multi-step solution that renovated the space, including installment of a raised floor with redundant UPS systems, and supported future expansion plans. The University’s Data Center expanded into the adjacent space to host IT customers from other institutions and area businesses.

The initial phase included a 2×200 kw NG MPS system located in the basement of the renovated building. The Generator bus supported Life Safety and the main data center using an LS ATS, a main IT ATS that supported the UPS and AC systems.

The second phase installed a third MG200 to support the co-location data center. The MG200 provided redundancy to the main data center. A new ATS was also added to support LS loads in an adjacent space.

Request Quote

One of our experts will be in touch within 1 - 2 business days.

or reach us by phone
716.693.4490

Request Info

One of our experts will be in touch within 1 - 2 business days.