Project Overview:

Stark’s boiler group worked with a mechanical contractor and engineer to design and implement a custom O-Style 60,000 lbs. per hour Victory Energy boiler system. The system replaced a 30,000 pph system and integrated with two existing boiler units installed in 1968.

Project Highlights:

  • Design & project phasing coordination
  • Conversion of existing dual-fuel boilers from #6 to #4 fuel oil for backup fuel
  • Supplied custom built boiler with double the capacity in the same footprint
  • High turndown burner allowed the same minimum load for double the capacity at full load
  • Ancillary equipment, including economizer, blow down separator, gas, steam, water flow meters, #2 oil fuel pump set
  • Startup and commissioning of new boiler with natural gas as primary, #2 oil secondary
  • Tied new boiler into existing Yokogawa SCADA system, adding touchscreen interfaces to all boilers

Boiler Expertise Highlights:

  • Design build capability with partners in mechanical contractors, mechanical engineers and site owners to create solutions that minimize downtime and ensure redundancy
  • Large Central Plant Equipment including custom steam boilers, high-efficiency boilers, ancillary steam equipment
  • SCADA System Support with extensive knowledge of boiler room controls systems
  • 24/7 Service and Maintenance with extensive expertise in steam applications